56 changes: 33 additions & 23 deletions work/portable-core-contracts/spec.md
Original file line number Diff line number Diff line change
Expand Up @@ -71,10 +71,18 @@ authority, or perform an external write.
shapes, registries, manifest/profile/resolution relations, and
request/result/status/evidence rules. It never resolves physical repositories,
launches a process, reads a raw fixture, or evaluates policy.
- **R14 — credible delivery bound.** One jq source, one shell front door,
table-driven tests, docs, restore entries, and operator-owned CI wiring must fit
400 normally formatted net lines. If the plan cannot prove that, return to G2;
no code-golf or size exception is accepted.
- **R14 — reviewable, evidence-backed delivery.** The plan estimates normally
formatted size and names cohesive review units for one jq source, one shell front
door, table-driven tests, docs, restore entries, and operator-owned CI wiring. Line
count is a reviewability signal, not a pass/fail gate. Complete behavior, complete
tests, CI, independent review, and the safety boundaries remain hard requirements.
Implementation remains one reviewable concern on the deterministic
`ystack/impl/portable-core-contracts` branch and PR. The operator accepts the
current estimate as an explicit exception to the repository's soft review-size
guide; line count alone does not require a split. The plan groups the one PR into
clear commits and review sections. Any actual concern or scope expansion returns
to the artifact gate. Nothing public or live activates before the full contract
and integration proof are accepted.
- **R15 — no live change.** This work does not activate a profile, extract a real
adapter, regenerate `/yshifu`, alter an open session, or enable autonomous writes.
The operator remains the only merge authority.
Expand Down Expand Up @@ -543,25 +551,25 @@ model/tool availability, evidence replay/passing-role rules, source/base and oth
stale selectors, generic escapes, and all three commands. They do not read Git,
launch a process, or use a network.

Implementation budget:
Planning estimate from the first implementation preflight:

| `contracts.jq` area | Lines |
| Area | Normal-format working range |
|---|---:|
| canonical/limit/exact-object helpers | 35 |
| primitive/ref/document shapes | 65 |
| capability/permission/profile relations | 45 |
| request/result/status/evidence relations | 60 |
| **jq subtotal** | **205** |

| Other area | Lines |
|---|---:|
| shell wrapper | 30 |
| table-driven tests and tiny fixtures | 135 |
| README, restore manifest, CI wiring | 30 |
| **Total** | **400** |

The plan rejects code golf, long generated lines, copied registries, or a second
parser. If ordinary formatting exceeds 400 lines, return to G2.
| `contracts.jq` | 380–755 |
| shell wrapper | 50–110 |
| readable fixtures and adversarial tests | 240–330 |
| docs, restore manifest, and CI wiring | 30–60 |
| **Likely total** | **about 800–1,100** |

These numbers guide plan review; they do not waive or reject work. The plan explains
large differences from the range and chooses review units by responsibility, not by
an arbitrary line target. Code golf, generated long lines, copied registries, a
second parser, system-jq drift, reused production logic as the test oracle, or reduced
negative coverage are never valid ways to appear smaller. This one-concern contract
keeps one implementation PR despite the estimate; commits and review passes separate
responsibilities without creating partial product releases. A newly discovered
concern or scope change returns to the artifact gate, and no plan may invent extra
implementation PRs for this intent.

### Downstream handoffs and intent questions

Expand Down Expand Up @@ -618,8 +626,10 @@ before any publisher can run.
and human-gate boundaries before real use.
4. **Forge 2×2 is unresolved by design.** The existing adapter-test intent must wait
or be separately rescoped; producer-only proof cannot be called its accepted 2×2.
5. **No implementation exception is accepted.** Strict parsing and the 400-line
bound cannot be met with a workaround; return to the artifact gate.
5. **Size never trades away proof.** The estimate may move, but strict parsing,
complete relations, readable code, adversarial tests, CI, and review do not. A
materially different concern or scope returns to the artifact gate. The accepted
review-size exception changes no safety or proof requirement.
6. **CI is a constitution path.** Operator-driven work may edit it; unattended work
must use `proposals/` and wait for application.
7. **This is user-directed high-risk design.** G2 accepts only this spec, not a plan,
Expand Down