Skip to content

Release process: drain the Breaking items shipped in max-v0.3.0 - #50

Merged
zeyuyang42 merged 1 commit into
mainfrom
release-process-drain-breaking
Oct 17, 2026
Merged

zeyuyang42 merged 1 commit into
mainfrom
release-process-drain-breaking

Conversation

@zeyuyang42

Copy link
Copy Markdown
Collaborator

max-v0.3.0 is published, so per "After shipping" in docs/design/release-process.md the two Breaking items pending in the Max checklist (the mc. rename, #21, and the root mode change, #19) are drained. Docs only.

🤖 Generated with Claude Code

…0.3.0

The "after shipping" step of the process: the mc. rename (#21) and the root
mode change (#19) went out with max-v0.3.0, so the Max checklist no longer
lists them as pending.

Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
@zeyuyang42
zeyuyang42 merged commit ba873f5 into main Oct 17, 2026
8 checks passed
@zeyuyang42
zeyuyang42 deleted the release-process-drain-breaking branch October 17, 2026 08:19
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant