Skip to content

Roadmap ODD index for Cortex #288

Open

Description

@barbatdev

Coordination index only: this issue tracks approved direction, milestones, and ODD work units. It is not an implementation issue and is not available for contribution. The static narrative lives in ROADMAP.md; this index is the living source for sequencing and readiness. The binding workflow rules live in docs/operating.md (ODD roadmap workflow section). Approved by the maintainer: cortex-odd-roadmap-v1-20261013. No dates, no promised versions.

Approved order

Milestone Work / active ODD Status and readiness
Collaborator experience #279 quick-start verification; #280 mode_drift CLI test; #281 install diagnostics root-cause fix Delivered. #279 closed via PR #320, #280 closed via PR #292, #281 closed with root-cause fix merged. Milestone complete.
Documentation family vertical #287 seed first capabilities Slice 1 delivered: odd-roadmap capability seeded in the catalog via PR #291; issue closed. Further capability slices require maintainer-approved proposals on the family vertical before implementation.
QA flagship vertical #286 end-to-end showcase; #78 fleet epic (bridge, capability profiles) Active. #286 starts now; its findings become follow-up issues. #78 carries the epic plan; bridge work follows the showcase.

How to contribute

Read CONTRIBUTING and the roadmap. Check the issue, this index, dependencies, and assignees before starting. New work without assignment and without overlaps; availability is revalidated before starting. Assignment is not an atomic lock, and requesting review does not take a PR or authorize merge.

Out of flow

Bugs and small tasks without ODD treatment (like #280) keep their normal issue-first flow and are not tracked as ODD units by this index.

Review work

Maintainer-approved addition (cortex-design-review-v1-20261014): #293 (review design-system capabilities for a Cortex design vertical) is review work, outside any milestone and without implementation issues until the review's go/no-go.

Not prioritized

Web, PCSoft (conditioned on cortex-brains shipping first), and reasoning/execution families are approved roadmap directions in ROADMAP.md but are not approved milestones yet: they become milestones only through a maintainer-approved revision appended to this issue. No issues are created for them automatically.

Revision 3 — Bounded release readiness

Objective: Verify the current capability distribution and publish only after the declared scope is supported by attributable evidence. This appends to, and does not replace, the approved roadmap history.

Order Outcome ODD work and readiness
1 Supported scope frozen #426 owns the declaration. docs/verification.md is authoritative after #443: macOS ARM64 and Linux AMD64, Claude Code, 12 frozen capabilities (24 combinations). Other runtimes remain experimental or excluded as declared.
2 Installation and recovery verified Bind checks to the candidate archives and source. Verify checksums before extraction, isolated install and asset readback, prior-release update, safe refusal, backups, partial-failure recovery and uninstall. Recheck historical QA/update failures; resolve or document specific exclusions and safe operator paths. Offline source checks are useful but not substitutes.
3 Capability evidence and QA journey complete Record structural, isolated install/readback and real invocation evidence for every declared combination. Recover and assess existing #286 evidence before rerunning anything. Close any remaining QA gap with a fresh install from a published artifact, a user-owned authenticated route, a real artifact and a valid bounded report. Reuse evidence when it meets both criteria. Record candidate, runtime, command, exit status and bounded redacted output.
4 Publication decision supported Reconcile evidence with ROADMAP.md and docs/verification.md. Publish only after required evidence and explicit delivery authorization; then independently download and verify tag, archives and checksums.

Parallel, not blocking: Investigate Pi detection through Gentle Shell and the historical guidance refusal with isolated state. Keep Pi experimental unless the declared scope is explicitly revised and verified. #396 is closed. Do not alter version or ownership policy based on launcher diagnostics alone.

How to contribute: Check existing issues, dependencies and assignees first. Put scope, acceptance checks and readiness in each work-unit issue before adding its link here. Do not reopen #286 solely because its issue lacks an evidence link. Small fixes stay in the normal issue-first flow.

Not prioritized here: #78 bridge, new families, tracking upstream main in CI, runtime pins for users and full runtime-family certification. Apply KISS and TEAR: use evidence and the smallest justified change.

Activity

  1. barbatdev commented on Oct 14, 2026

    @barbatdev
    ContributorAuthor

    Proposed revision — design vertical review

    Proposed addition for maintainer approval: #293 (review design-system capabilities for a Cortex design vertical, informed by egdev-design-system and Gentleman-Programming/design-skills).

    • Placement: review issue only; no milestone yet. If the review lands on go, it becomes a Track B candidate and a roadmap revision would sequence it relative to the approved order (documentation first).
    • Readiness: the review itself can start now (issue is labeled and specified). No implementation issues are created until the review's go/no-go.
    • Per the practice, this stays in proposal state here until the maintainer approves the revision.

    Maintainer decision needed: approve this revision (adds the review work to the approved order) or keep #293 out of flow for now.

  2. barbatdev commented on Oct 14, 2026

    @barbatdev
    ContributorAuthor

    Approved revision — cortex-design-review-v1

    Maintainer-approved addition: #293 (review design-system capabilities for a Cortex design vertical) joins the approved order as review work, outside any milestone and without implementation issues until the review's go/no-go.

    Current scope

    Outcome Work / active ODD Status and readiness
    Design vertical review #293 — recommended capability set, family placement, provenance findings, representation notes Can start now (issue is labeled and specified). No implementation until the maintainer decides on the review outcome. On go, it becomes a Track B candidate via a future revision sequencing it against the approved order (documentation first).

    Prior revisions (cortex-odd-roadmap-v1) are preserved unchanged. No dates, no promised versions.

  3. barbatdev commented on Oct 17, 2026

    @barbatdev
    ContributorAuthor

    Fleet issue review (glm)

    Recommendation: needs work

    This is explicitly a coordination index, not an implementation issue ('this issue tracks approved direction, milestones, and ODD work units. It is not an implementation issue'). As such it has no testable acceptance criteria of its own and is unbounded by design (a living index whose scope is the whole roadmap). The rubric judges deliverable readiness, so it fails two items; individual tracked work units (#279, #280, #281, #286, #287, #293) should each be reviewed separately. The maintainer decision raised in comments (cortex-design-review-v1 revision) is recorded as approved, so no decision is pending here.

    Item Pass Evidence
    clear problem yes The issue states its purpose clearly: a living coordination index for approved ODD milestones and work units, with the approved order tabulated and the maintainer approval token (cortex-odd-roadmap-v1-20261013) recorded.
    acceptance criteria present and testable no No acceptance criteria exist or can exist for an index: readiness and sequencing live in a status table referencing other issues, and nothing here is independently checkable ('Planned' states are not testable criteria).
    scope bounded no By design the scope is open-ended: the index tracks the entire roadmap across three milestones plus review work, grows via maintainer-approved revisions, and states 'No issues are created for them automatically' for future directions.
    no open questions yes The one decision raised in comments (approving the #293 design-vertical revision) is recorded as approved ('## Approved revision — cortex-design-review-v1'); nothing currently blocks a decision.

    Only Juan adds the status:approved label; this review is advisory.

  4. barbatdev commented on Oct 18, 2026

    @barbatdev
    ContributorAuthor

    Status revision — cortex-odd-roadmap-v2-20261018

    Status refresh only; no change to approved direction or order.

  5. barbatdev commented on Oct 19, 2026

    @barbatdev
    ContributorAuthor

    Fleet issue review (glm)

    Recommendation: needs work

    This remains a coordination index, not an implementation issue: it explicitly tracks approved direction, milestones, and ODD work units and states it 'is not an implementation issue'. The cortex-odd-roadmap-v2-20261018 comment is a status refresh only and changes nothing structural, so the prior judgment stands: no testable acceptance criteria of its own and open-ended scope by design. The individual work units it references (#279, #280, #281, #286, #287, #293) are the reviewable deliverables and should each be judged separately.

    Item Pass Evidence
    clear problem yes The issue states its purpose precisely: a living coordination index for approved ODD milestones and work units, with the approved order tabulated and approval tokens (cortex-odd-roadmap-v1-20261013, cortex-design-review-v1-20261014) recorded.
    acceptance criteria present and testable no No acceptance criteria exist for an index: readiness and sequencing live in status tables referencing other issues, and the v2 revision is explicitly a 'Status refresh only', so nothing here is independently checkable.
    scope bounded no By design the scope is open-ended: the index tracks the whole roadmap across milestones plus review work and grows via maintainer-approved revisions ('they become milestones only through a maintainer-approved revision appended to this issue').
    no open questions yes The maintainer decision raised in comments (cortex-design-review-v1 revision) is recorded as approved, and the latest comment (cortex-odd-roadmap-v2-20261018) is a status refresh that requests no decision; nothing currently blocks a decision.

    Only Juan adds the status:approved label; this review is advisory.

  6. barbatdev commented on Oct 19, 2026

    @barbatdev
    ContributorAuthor

    Revision v3 — PowerShell runtime target and Windows platform (approved by the maintainer)

    Adds two milestones from the maintainer-approved scoped plan in docs/design/issue-332-powershell-windows.md (#332). Phase A does not require Phase B; each phase carries its own readiness gate. Work-unit issues are created only when their readiness gate resolves. No dates, no promised versions.

    Approved order addition

    Milestone Work / active ODD Status and readiness
    PowerShell runtime target Scoped plan: docs/design/issue-332-powershell-windows.md Phase A (#332) Blocked on readiness gate: destination evidence (layout, profiles, probe command), open decisions resolved (profile selection, QA actor handling, emit-to-directory scope), maintainer scope approval. No issues created yet.
    Windows platform Scoped plan: docs/design/issue-332-powershell-windows.md Phase B (#332) Blocked on readiness gate: real Windows verification environment, Windows mode/backup semantics design approved, maintainer scope approval. No issues created yet.

    Both milestones were created outcome-named; no work-unit issues exist yet. #332 remains the source issue.

    Refs #332 #303 #78

  7. barbatdev commented on Oct 19, 2026

    @barbatdev
    ContributorAuthor

    Work-unit issues created for milestone PowerShell runtime target after the Phase A readiness gate resolved (directory projection mode, scoped plan Phase A revision v2): #341 install directory target; #342 update/uninstall via ownership (blocked by #341); #343 doctor reporting (blocked by #341); #344 QA actors as skills + consumption-contract docs. Milestone Windows platform remains without issues: readiness gate still open.

  8. barbatdev commented on Oct 21, 2026

    @barbatdev
    ContributorAuthor

    Milestone PowerShell runtime target delivered: the directory projection mode landed via #353 (#341 install), #354 (#342 update/uninstall), #355 (#343 doctor), #356 (#344 QA actors as skills + Agent Skills consumption contract docs). All four work units merged to main with green CI; issues auto-closed. Milestone Windows platform remains gated on a real Windows verification environment and the mode/backup semantics design.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    type:docs

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions