Skip to content

docs: full audit — correct stale counts/status/plans and refresh indices - #162

Merged
m5agent merged 1 commit into
mainfrom
m5agent/docs-final-audit
Nov 3, 2026
Merged

m5agent merged 1 commit into
mainfrom
m5agent/docs-final-audit

Conversation

@m5agent

@m5agent m5agent commented Nov 3, 2026

Copy link
Copy Markdown
Owner

范围

收口后全仓文档审查与纠错(15 个 docs/snapshot 文件;不改模型/测试逻辑、不改历史证据正文)。

主要修正

历史处理原则

  • 各批历史行的时点数字(35/39 层、129/31 等)保留(按日期追加的证据),仅加时点注与最终指向。
  • 未逐句重写历史研究/计划正文,避免制造虚假历史回写;发现但未改的 6 项(旧计划 TODO、host issues 历史行等)在提交报告列出。

验证

  • 全量平台测试 Ran 1929 tests ... OK (skipped=10);四 check 全绿;docs 契约 50 OK;check_pr_scope PASS(15 blobs,evidence 13,128 B)。

Audit the current-state, plan, deployment and index documents after the
campaign closure and correct stale or contradictory text. Historical evidence
pages are not rewritten; historical implementation/plan pages only get a
time-point marker plus a pointer to the final state.

- project-backlog: UNIT-01 task row and summary now 158 implemented/partial +
  2 DEFER; UNIT-DEFER-01 remains the only open Unit queue (mini-bps-v11
  QMP6988 0x56/0x70 ambiguity, mini-pdm without a Unit PDM driver).
- workstreams: UNIT-01 marked completed (virtual-device) with 9 host access +
  5 boundary decisions, Unit 160 = 158+2, 25 c-class boundaries, 41 layers,
  PR #80-#161; UI-01 shell fidelity remains open.
- engineering-handoff: replace the stale "UNIT-01 in progress" paragraph with
  the closed campaign state and add a 2026-11-03 closure section covering
  counts, canonical 41-layer chain, the real model bug fixes (unit-id ATECC
  wake/CRC 0156, glass REG_INDEX 0157, MQ ADC12 0160, AA55 Chain frame
  length 0161) and the virtual-device / PORT.A harness / NOT RUN boundaries.
- project-status/backlog/deployment/pages-deployment: keep unit counts and
  the 41-layer chain in sync; record 2026-11-03 deployment check dates and the
  current inventory against serve.py's default 8787 entry and the manual
  Pages workflow inputs (publish/base_path/service_url).
- README index: fix the batch12a/b implementation-status rows to their actual
  historical patch numbers/layer time point (0158/36 layers; 0159/39 layers),
  mark them as historical, refresh the freshness dates for the modified
  authority/plan pages, and add the final PR range #80-#161.
- validation-ledger: annotate the earlier phase summary as historical time
  point #146 (129/31) and point to the final 158/2/41 row instead of
  presenting stale numbers as current.
- plans/2026-10-25-unit-runtime-integration, plans/2026-11-02-remaining-
  visual-hosts-and-units, unit-integration-host-issues, batch12a/b
  impl-status: add current closure/time-point notes; update the final
  remaining-host/Unit counts without rewriting their historical detail.
- project snapshot regenerated via project_snapshot.py --write.

Full platform suite 1929 tests OK (skipped 10); four checks pass. No models,
tests or historical evidence content changed. No push/PR.
@m5agent
m5agent merged commit 3691870 into main Nov 3, 2026
4 checks passed
@m5agent
m5agent deleted the m5agent/docs-final-audit branch November 3, 2026 01:43
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant