Skip to content

docs: bring the Anthropic directory submission doc up to date and log where the submission stands - #211

Merged
aterga merged 1 commit into
mainfrom
arshavir/modest-darwin-2zrw15
Oct 27, 2026
Merged

aterga merged 1 commit into
mainfrom
arshavir/modest-darwin-2zrw15

Conversation

@aterga

@aterga aterga commented Oct 27, 2026

Copy link
Copy Markdown
Collaborator

Summary

Updates docs/anthropic-directory-submission.md so it matches Anthropic's current connector docs (re-verified 2026-10-23) and records where the submission stands: submitted 2026-09-28 as "Internet Computer" (slug icp), In review since, no reviewer feedback as of 2026-10-27.

Related issues

None.

Changes

  • New Submission log section near the top: the 2026-09-28 submission and its status, and the 2026-07-31 pre-submission email to mcp-review (automated acknowledgement only, ticket #120537913, no human reply; its question is moot since the funding tools were removed and ledger methods are refused).
  • Where and how submission happens: portal is now claude.ai/directory/manage (this listing: /directory/manage/icp); anyone on a paid Claude plan can submit; the MCP-connector status model (Draft, In review, Changes requested, Not approved, Approved, Published) with what "In review" means and the Approved-before-publish edit caveat; escalation to mcp-review with listing name, submitting organization, and portal status; link to the Submission status doc.
  • Review model names the Verified review's functional test of each tool; blocker 3 quotes the test-credentials criterion as it reads now.
  • Blocker 1 marked resolved (URL entered with the submission); blocker 2's mcp-review paragraph records the outcome; blocker 4 notes the rc-*/v* scheme from Release from candidates: rc-* tags deploy staging, v* tags publish the crates and the local MCP #204 and the 0.5.1 crates.
  • Portal field drafts: name and slug marked superseded by what was submitted (Internet Computer, icp).
  • Submission-day checklist: privacy policy, test-account instructions, and release cut ticked; the submitter-access item reworded to the paid-plan rule; the rest left as is.

Testing

Docs-only change; no code touched.

  • cargo build --locked --all-targets (n/a)
  • cargo test --locked --all-targets (n/a)
  • cargo fmt --all / cargo clippy --all-targets (n/a)
  • npm test --prefix monitoring/mcp-status (n/a)

Checked that no stale references to the old portal URL or the org-role rule remain in the doc.

Checklist

  • I have read the Contributing guidelines.
  • Docs (README / comments) updated for any user-visible change.
  • No secrets, credentials, or internal-only information are included.

Generated by Claude Code

… where the submission stands

The portal moved to claude.ai/directory/manage, anyone on a paid Claude plan
can submit (no org role), and Anthropic now documents the status model (Draft,
In review, Changes requested, Not approved, Approved, Published) and the
escalation details for mcp-review. The review-criteria wording on test
credentials is quoted as it reads now, and the Verified review's functional
test of each tool is named.

A short submission log near the top records the 2026-09-28 submission as
"Internet Computer" (slug `icp`), In review since with no reviewer feedback as
of 2026-10-27, and the 2026-07-31 pre-submission email's automated-only reply,
whose question is moot now that the funding tools are gone and ledger methods
are refused. The name and slug drafts are marked superseded by what was
submitted, and the checklist ticks the privacy-policy entry, the test-account
instructions, and the release cut (crates at 0.5.1, the rc-*/v* tag scheme
from #204).

Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01VP2vTG15YJQ17XeyyDmZSE
@aterga
aterga requested a balanced review from Copilot October 27, 2026 13:28
@aterga
aterga marked this pull request as ready for review October 27, 2026 13:28
@aterga
aterga requested a review from a team October 27, 2026 13:28
@aterga
aterga merged commit 9a8c176 into main Oct 27, 2026
17 checks passed

Copilot AI left a comment

Copy link
Copy Markdown

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

🟢 Approval recommended

No active review issues are recorded for the Anthropic directory submission guide update.

No open issues 🎉

What changed in this PR

Updates the Anthropic directory submission guide to reflect current connector submission requirements and record the Internet Computer listing’s review status.

Changes:

  • Adds the submission history and records the listing as “In review,” with no feedback as of October 27.
  • Refreshes portal links, eligibility rules, review stages, and escalation guidance.
  • Updates submitted field values, blocker notes, release context, and checklist completion.
File Description
docs/​anthropic-directory-submission.md Refreshes submission guidance and records the listing’s status and completed preparation steps.

Review effort: Balanced

aterga pushed a commit that referenced this pull request Oct 28, 2026
#211 (merged 2026-10-27) brought docs/anthropic-directory-submission.md up to
the current connector docs and logged the submission with the facts from the
portal (name "Internet Computer", slug icp). This branch had done the same
work from the same base; its version is dropped in favour of main's, and the
one entry main lacks follows in the next commit.

Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01Ui6YJGczXE8vZv2pjyxX2F
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants