Problem. Verification is bounded by a single global constant, CLAUDE_VERIFICATION_TIMEOUT_MS = 600_000 (scripts/stage_permissions.py:121). It is applied twice: the Claude executor exports it as BASH_DEFAULT_TIMEOUT_MS and BASH_MAX_TIMEOUT_MS (scripts/executors.py:2863-2864), and the Bash hook rejects a lower explicit timeout on a configured verification command (scripts/stage_permissions.py:543). Background Bash is rejected (:536) so no run goes untracked. A project whose suite needs 20-60 minutes cannot complete a cycle, and raising the constant to 30 minutes only moves the wall.

Goal. Verification must scale to small and large projects, and to several concurrent cycles, without the duration of a suite deciding whether a cycle can finish, and without losing fail-closed behaviour, traceability, idempotency or the verification guarantees.

Scope (investigation and proposal only; no code or contract changes). Analyse and document, with file and line references:

  1. Where timeouts for Claude, Bash, stages, dispatches and verification commands are configured and enforced, and how they relate (command vs agent call vs stage deadline vs DEFAULT_DISPATCH_TIMEOUT_SECONDS).
  2. How checks are planned, executed and recorded during implement, verify, review and rereview.
  3. How long runs, cancellations, interruptions and resumes are handled today (relation to feat(runtime): cap a cycle's wall-clock time and tokens with a resumable budget stop #262 and Resume a stage's pending operation after a grant instead of rerunning it #323).
  4. When the same check runs again on the same HEAD and under which conditions its evidence could be reused (code, configuration, environment, command identity).
  5. Which planning, supervision and concurrency mechanisms already exist and can be reused rather than duplicated.
  6. How to introduce per-project and per-check configuration without breaking current contracts.
  7. How to run supervised long executions without bypassing permission policy or losing traceability.

Deliverable. A research document under docs/research/ that ends with the proposal split into independent issues, each with dependencies, acceptance criteria, risks and regression tests, separating immediate improvements from architectural changes. It confirms, adjusts or replaces the four follow-up issues linked below.

Out of scope. Changing code, hooks, configuration keys or contracts; implementing any phase.

Follow-up issues. #377 (configurable timeouts), #378 (redundant verification and evidence reuse), #379 (supervised runner), #380 (concurrency limit). Related: #237 (selective tests), #262 (cycle budget), #323 (resume pending operation), #367 (CI evidence for a required check), #290/#366 (verification plan).

Acceptance criteria.

Tests. None (documentation only). The document passes the repository's documentation checks.

Activity

  1. added
    enhancementNew feature or request
    P1Needed for 2.0, after the critical path
    on Oct 30, 2026
  2. added a commit that references this issue on Oct 30, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    P1Needed for 2.0, after the critical pathenhancementNew feature or request

    Projects

    No projects

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions