ADR-0007 schema ruling: is job-level concurrency: permitted in agent-ingress.yml? #2001
Description
The decision needed
ADR-0007 enumerates the agent-ingress.yml schema as on: / permissions: / jobs: (with uses, with, secrets, if, permissions, name). It does not enumerate concurrency:. A ruling is needed before the pilot collapse can merge.
Raised by the #1729 collapse package — PR #1977, docs/initiatives/agent-ingress-collapse-markets.md §4 — which flagged it rather than deciding it.
Why it comes up
In petry-projects/markets, three of the five collapsing stubs (pr-auto-review.yml, pr-review.yml, ci-failure-analyst.yml) each carry a workflow-level concurrency: block. dev-lead.yml centralizes concurrency inside its reusable and has no caller block.
One collapsed workflow cannot host three distinct workflow-level groups without cross-role cancellation — role A's run would cancel role B's. So §3 of the package renders each as a job-level concurrency: block, which Actions supports and which preserves each role's grouping in isolation.
The two readings
- Allow job-level
concurrency:as a declarative grouping key — it carries nosteps:/run:and reaches for no repo state, so it is not logic under ADR-0001's thin-caller rule. This is what §3 assumes. Dropping it would regress the duplicate-run collapse the source stubs added ([LSP re-pilot placeholder] TypeScript / JavaScript (typescript-language-server / tsgo) — broodly / google-app-scripts / markets #1126). - Forbid it as outside the enumerated schema, forcing concurrency grouping down into each reusable. Viable, but that is a reusable change per role and would gate the pilot on work in four other components.
Package recommendation
Ratify reading (1) with a one-line schema addendum to ADR-0007: concurrency is a declarative grouping key, not logic. Reading (2) is defensible but should not gate the pilot.
Why this blocks
The companion issue §10 ships to markets with a pre-merge gate item: "Confirm the §4 job-level concurrency ruling is ratified." Until this is decided and recorded, the pilot collapse cannot merge — and if it merged on the unratified assumption, a later reading (2) would invalidate the shipped ingress.
Acceptance criteria
- The ruling is recorded (ADR-0007 addendum, or a superseding ADR if the answer changes the thin-caller boundary).
- If reading (1): the
if:-as-event-filter checker andvalidate-caller-inputsaccept a job-levelconcurrency:block and still reject logic — with a test asserting both. - If reading (2): the per-role reusable changes are enumerated as follow-ups and [Phase 3] Collapse the first repo's Class-1 event-driven stubs into agent-ingress.yml and rename the required checks #1729's §3 is corrected before the companion issue is filed.
- The decision is linked from [Phase 3] Collapse the first repo's Class-1 event-driven stubs into agent-ingress.yml and rename the required checks #1729 so the markets gate item can cite it.
Activity
don-petry commentedon Oct 1, 2026
@petry-projects/solution-architect measure this against our ADRs and rule on it.
The specific question: does ADR-0007's enumerated
agent-ingress.ymlschema permit a job-levelconcurrency:block, or does omitting it from the enumeration forbid it?What I would like from you, in order:
if:may act as a pure event filter. Does aconcurrency:group key sit inside that boundary (a declarative grouping key with nosteps:/run:and no repo-state reach), or does enumerating the schema make the list exhaustive by construction?Context is in the issue body above; the rendered ingress is §3 of
docs/initiatives/agent-ingress-collapse-markets.mdon PR #1977, with theif:provenance table in §3a.Please do not assume the package's recommendation is correct — it is the proposer's reading, and the precedent question in (3) is the part it does not weigh.
don-petry commentedon Oct 1, 2026
dev-lead is withholding action on this item.
It is labeled
needs-human-review(flagged for human review — this label is applied by automation as well as by people, so an item can become held without anyone noticing), so dev-lead will not pick it up while that label is present. This notice is posted once so the withhold is visible rather than looking like a stalled run.To re-enable automated pickup: remove the
needs-human-reviewlabel.github-actions commentedon Oct 1, 2026
Thanks for writing this up so thoroughly, and for flagging the ADR-0007 schema gap before the pilot collapse merged. Classifying this as a question about the ADR plus a documentation follow-up (the addendum). Before a ruling can be recorded: is there any case where a job-level
concurrency:block in agent-ingress.yml would needcancel-in-progressor a group expression that reads event or repo state (e.g.github.event.*context), or are all the groups in the markets stubs static or simplegithub.ref-style keys? That answer determines whether 'declarative grouping key, not logic' holds cleanly for the checker andvalidate-caller-inputs.don-petry commentedon Oct 1, 2026
Answering the clarifying question with the actual rendered blocks, since it decides the ruling.
No — none of the three is a static or
github.ref-style key. All three readgithub.event.*, and two use conditional expressions. Verbatim from §3 of the package:So one block does set
cancel-in-progress(explicitlyfalse, preserving the source stub's behavior), and every group is event-payload-derived.Why I read that as supporting (1) rather than defeating it: ADR-0007's loosening for job-level
if:already permits exactly this surface —github.event_name,github.event.action, and payload predicates — and draws its line at repo state ("anything reaching for repo state is logic and stays in the reusable"). None of these three reaches repo state: no API call, no label or ruleset lookup, noneeds.context, no step output. The two conditionals select a group name per event shape, which is the same payload-predicate shape the ADR sanctions forif:.That suggests the ruling is narrower and more checkable than "allow
concurrency:":That keeps the enumeration permissive-but-bounded rather than open-ended, and it is enforceable: the #1725
if:-as-event-filter checker already implements exactly that predicate test and could be pointed atconcurrency.groupwith no new logic.@petry-projects/solution-architect — with that evidence, please issue the ruling and name the recorded form (ADR-0007 addendum vs superseding ADR). The precedent question still stands and is the part I would most like your judgment on: does enumerating a schema make the list exhaustive by construction, or permissive-with-a-boundary? The answer governs every future ingress schema question, not just this one.
don-petry commentedon Oct 1, 2026
Solution Architect — structural advisory
Governing ADR: ADR-0007 (One agent-ingress stub per repo), read with ADR-0001 (thin-caller boundary) and ADR-0000 (ADR process).
Alignment: drifts, but the fix is small. ADR-0007's Decision says "The allowed schema is:" and lists the keys, then forbids "any logic outside the
if:guard". The conditionalconcurrency.groupexpressions are logic outside theif:guard, so reading (1) needs a new recorded decision. Calling it an interpretation of ADR-0007 isn't enough.What I'd shore up (highest leverage first):
strategy:,env:,continue-on-error:) would each have to be argued case by case, andstrategy.matrixis plainly logic. Each new key costs one ADR. ADR-0000 says that ceremony is the point.groupis limited to the payload surface already allowed inif:, andcancel-in-progressmust be a literal boolean. This follows ADR-0007's own reason for one job per role: per-role state can't be merged into one shared value.Escalate? no. This needs a human to accept the ADR; nothing here is unsafe.
Advisory only — I comment, I do not change code. Ground: BMAD Method architect
(bmad-agent-architect v6.8.0). Opt out on this item with the
solution-architect:hands-off label.
don-petry commentedon Oct 1, 2026
Ruling received and accepted as the direction. Implementation filed as #2002 (labeled
dev-lead), carrying all four decision elements as ACs: the boundedgroupsurface,cancel-in-progressas a literal boolean, the role-prefix + no-reusable-collision rule, and the exhaustive-allowlist precedent withstrategy:/env:/continue-on-error:explicitly not admitted. ADR-0010 will be authoredproposed— human acceptance is the gate, per the advisory.Two corrections to my framing above, for the record: an ADR-0007 addendum is not available (ADR-0000 makes accepted ADRs immutable), and "permissive-with-a-boundary" was the wrong reading — the enumeration is an allowlist because the freeze and caller-input tooling can only enforce a closed list. The collision rule was not in my proposal at all and is a live case, since
dev-leadcentralizes concurrency inside its reusable.This issue stays open until ADR-0010 is accepted, so the #1729 §8a gate item has something ratified to cite.
don-petry commentedon Oct 10, 2026
Answered. The ruling (job-level
concurrency:is permitted, bounded) was recorded as ADR-0010 (issue #2002; ADR accepted in #2036). It is in use in the markets collapse (combsmith/markets#513, merged 2026-10-10). Closing as completed.