Skip to content

content: OpenTelemetry graduation + NetEase Fluid LLM cold-start posts#1307

Merged
bobbyonmagic merged 1 commit into
mainfrom
post/otel-graduation-and-netease-fluid
May 26, 2026
Merged

content: OpenTelemetry graduation + NetEase Fluid LLM cold-start posts#1307
bobbyonmagic merged 1 commit into
mainfrom
post/otel-graduation-and-netease-fluid

Conversation

@bobbyonmagic

Copy link
Copy Markdown
Collaborator

Two posts in one PR, both fresh news from last week.

OpenTelemetry graduates from CNCF (May 21). Practical decision framework: which proprietary agents to retire from your stack now that all three OTel signals are production-ready, which to keep for now, and a 90-day rollout plan. Pulls in the official stats (12,000+ contributors, second-most-active CNCF project after Kubernetes).

NetEase Games + Fluid: 42-minute LLM cold starts to 30 seconds (May 21). Engineering deep-dive on the case study. Walks through the four-step staircase of architectural bets, what makes Fluid more than a wrapper around Alluxio, and the transferable principles for non-Kubernetes setups.

OG images generated for both. Slugs verified unique against existing content.

@bobbyonmagic bobbyonmagic merged commit 3a6c399 into main May 26, 2026
3 of 4 checks passed
@bobbyonmagic bobbyonmagic deleted the post/otel-graduation-and-netease-fluid branch May 26, 2026 09:37
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant