Skip to content

docs(rpo-rto): Q4 binlog 반출 주기 60초 확정 - #856

Merged
Khyojae merged 2 commits into
mainfrom
docs/rpo-q4-ship-interval
Nov 11, 2026
Merged

Khyojae merged 2 commits into
mainfrom
docs/rpo-q4-ship-interval

docs(rpo-rto): Q4 리뷰 반영 — 61초는 반출 성공 조건부, 4.5건은 평균 기준, 재오픈에 19초 한도 직접

a8d892b
Select commit
Loading
Failed to load commit list.
coderabbitai / CodeRabbit skipped Nov 11, 2026 in 0s

Review skipped: manual review required for this OSS repository

Result: Skipped - Review skipped: manual review required for this OSS repository
Run ID: c4809a35-c5d6-4fae-b41c-a7dca94bb523

Step Status Time
Prepare review scope Skipped 3s 588ms
Prepare repository workspace Skipped 0s
Run analysis checks Skipped 0s
Generate review feedback Skipped 0s
Publish review results Skipped 0s
Time taken 3s 589ms