# Pre-ship security pass

**Status:** In progress. Audit finished 2026-10-16 against `main` at `df25e985`. The clear fixes are on branch `security/preship-pass`, not merged or deployed; the decisions for Adam are under [Needs Adam](#needs-adam).
**Status:** In progress. The fixes shipped on 2026-10-17: #148 merged as `f16e8a4`, migration `20261016120000` applied and all 14 Edge Functions redeployed on staging and production. The decisions under [Needs Adam](#needs-adam) are still open.

The checklist follows the shape of a 25-item pre-ship security pass run by parallel subagents. The source post could not be fetched (x.com returned 402), so the items below are a standard pre-ship list adapted to DebateLab's stack: Supabase Postgres and Auth, Deno Edge Functions, a Vite client on Vercel, OpenRouter, Exa, Stripe, ElevenLabs and Google export.

Expand Down
2 changes: 1 addition & 1 deletion plans/README.md
Original file line number Diff line number Diff line change
Expand Up @@ -6,7 +6,7 @@ Every plan lives in this folder and opens with a `**Status:**` line; a plan list

## In progress

- **Pre-ship security pass.** A 25-item audit of the database, Edge Functions, client and hosting, with fixes for the clear findings. Plan and report: [2026-10-16 security pre-ship pass](2026-10-16-security-preship-pass.md).
- **Pre-ship security pass.** A 25-item audit of the database, Edge Functions, client and hosting. The clear fixes shipped to production on 2026-10-17 (#148); the decisions for Adam remain. Plan and report: [2026-10-16 security pre-ship pass](2026-10-16-security-preship-pass.md).
- **Staging that tracks main.** Audit of staging, the VPS sync timer, the seed, and what to delete. Plan: [2026-10-03 staging loop](2026-10-03-staging-loop.md). Previews come from #95 and the staging spec fix from #100.