Skip to content

Legacy 2023-vintage build of the microcosm UK spine (deferred) #687

Closed

Description

@juaristi22

Workstream E of the UK-migration master epic #665; child of #145. Rescoped 2026-08-19 per the vintage decision on #723: the migration now targets FRS 2024-25 directly, so this issue — formerly "FRS 2024-25 refresh after the 2023 swap" — inverts into the deferred option it displaced.

Scope (if ever activated)

Materialize the 2023 vintage from the microcosm pipeline, only if a concrete consumer needs it (e.g., historical comparability against populace_uk_2023 / the June release):

Where the old E11 scope went

Not on the August path. No owner. Unscheduled — close outright at decommission (WS-J) if no consumer has claimed it by then.

Activity

  1. changed the title [-]FRS 2024-25 refresh of the microcosm-built spine[/-] [+]Legacy 2023-vintage build of the microcosm UK spine (deferred)[/+] on Aug 19, 2026
  2. juaristi22 commented on Oct 14, 2026

    @juaristi22
    CollaboratorAuthor

    Closing as not planned. No consumer has claimed a 2023-vintage build since the 2024-25 national line was certified (microcosm-uk-2024-25-national, published 2026-10-04); the June 2023 artifact stays registered for historical comparison. The 2026-10-06 audit on #796 proposed this close, and #796's entry now carries the pointer.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    enhancementNew feature or request

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions