Skip to content

UK State Pension dynamics to 2050 for the triple lock costing #501

Open

Description

@MaxGhenis

The plan is at docs/plans/uk-state-pension-dynamics.md (merged in #502). It scopes a UK State Pension projection for PolicyEngine UK, with the Burnham-plan costing in uk-triple-lock as the driving use case and acceptance benchmark.

Why

Plan

Phase 1.

  • Reweight the survey's fixed age slots each year to the ONS 2024-based projections.
  • Assign each slot the entitlement of the birth cohort it represents, from a cohort entitlement model. The model covers mortality, State Pension age by date of birth, qualifying-year accrual to the transitional rate and protected payments, migration, and pensioners abroad with frozen and uprated pensions.
  • Deliver a path-independent sidecar that PolicyEngine UK pins per year, plus a synthetic abroad dataset built only from published aggregates.

Phase 2. Person-level trajectories on version 2 of the same contract, which merge only if they beat Phase 1 on held-out facts.

Work packages

Phase 1 (estimates: about 26-41 agent-days, 10.5-14.5 human review days, 4-7 weeks elapsed if rulings and upstream merges come promptly):

Phase 2 (estimates: 25-38 agent-days without licensed data; licensed-panel accrual adds 12-20 after access):

  • P2.1 Population kernels on persons
  • P2.2 Residence kernels and overseas flows
  • P2.3 Person-level accrual from fitted propensities
  • P2.4 Labour, partnership, widowhood and claiming kernels
  • P2.5 Accrual from Understanding Society, BHPS and ELSA histories

Depends on (consumed, not duplicated)

Related: PolicyEngine/policyengine-uk#1929, the engine-side statement of this problem.

Acceptance

Gates, locked before the one-shot run (their targets are published and known; the registration says they are not blind):

  • G1: DWP Spring 2026 caseloads by type in 2030-31.
  • G2: DWP Spring 2026 spending by type in 2030-31.
  • G3: Stat-Xplore full-rate bands for cohorts held out of estimation.
  • G4: Stat-Xplore abroad backcast, May 2022 to March 2026.

Registered comparisons:

  • R1-R2: the OBR's July 2026 path.
  • R3: DWP's £15bn and £50bn, as a single-path comparator against our single-path runs only.
  • R4-R7: protected-payment inflows, Pension Credit, the cost of unfreezing, and Northern Ireland.
  • R8: a blind comparison with the September 2027 Stat-Xplore release.
  • R9: DWP Spring 2026 caseloads and spending by type, each year 2025-26 to 2029-30.

Decisions needed

Listed in the plan's "Decisions needed" section and queued for Max.

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions