Skip to content

[scheduled-gate:test.yml] CI core gate is failing on main #10030

Description

@github-actions

CI core gate has a completed red post-merge run.

Current failure

  • Run: 37689361134
  • Head: 5423c426f4066c666aa3311672aef270ff69f3ae
  • Trigger: push

Failing rows

  • main-gate / Require the plan and every planned job to have passed

Delta from the previous failed run

Previous failure: dffccc7e648a

New failing rows:

  • None.

Rows that recovered:

  • None.

Last green main result

No green post-merge run was found in the last 100 results.

Maintained automatically by gate-failure-watch.yml for test.yml. Repeated failures update this issue; the next green run closes it.

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions