Skip to content

docs: live-board fixes plan - #637

Merged
FlyM1ss merged 2 commits into
mainfrom
docs/live-board-fixes-plan
Oct 15, 2026
Merged

FlyM1ss merged 2 commits into
mainfrom
docs/live-board-fixes-plan

Conversation

@FlyM1ss

@FlyM1ss FlyM1ss commented Oct 15, 2026

Copy link
Copy Markdown
Collaborator

Adds the live-board fixes plan: an index plus one plan per PR (P1–P7) under docs/superpowers/plans/. Each phase was dry-run on main@17c552c5 and then verified item by item. Also corrects five claims in the 2026-10-14 direction spec, with a dated Errata block plus in-place fixes. No code changes.

Deadlines

  • P4 must merge by 2026-10-31.
  • P3 must merge before 2026-11-01.
  • P1 must be merged and deployed by 2026-11-20, because the first early close is 2026-11-27.

Owner decisions are listed in the index, under "Owner decisions" (9 items). The ones with a cost:

  • Nemotron's Season 1 source;
  • a new ≈ $2.1/month for Qwen + Haiku from November (Live total ≈ $2.4/month, bounded by a $50 cap).

User-facing docs this plan does not edit (follow-ups; P6 and P7 PR B cover the rest):

  • dashboard/frontend/app.html ≈:1593, About text: "Each night after the 16:00 ET cash close". On early closes the close is 13:00.
  • dashboard/frontend/js/leaderboard.js ≈:776: "Advances nightly after the 16:00 ET cash session". Same issue.

🤖 Generated with Claude Code

An index plus one plan per PR (P1-P7) for the legacy-engine live
board fixes, each dry-run on main@17c552c5 and verified item by item.
The direction spec gains a dated errata block and five in-place
corrections found while planning.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
@vercel

vercel Bot commented Oct 15, 2026 •

Copy link
Copy Markdown
Contributor

The latest updates on your projects. Learn more about Vercel for GitHub.

Project Deployment Actions Updated
agentic-trading-lab Ready Ready Preview Oct 15, 2026 5:30am UTC

P1 ran on fix/live-early-close; a prior-art scan (libraries, exchange
releases, vendor responses, literature) and a final review added nine
commits. The plan now lists them with their reasons, the references and
verdicts (adopt / cite / cross-check), what was confirmed unchanged, what
stays open, and pointers for later plans. Task 1.5's PR body and dated
issue are updated for the amended branch, and Decision 1 notes the change.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
@FlyM1ss
FlyM1ss merged commit 5ba6782 into main Oct 15, 2026
8 checks passed
@FlyM1ss
FlyM1ss deleted the docs/live-board-fixes-plan branch October 15, 2026 18:58

This branch was successfully deployed

1 active deployment
Preview — 18ef542b Deployed Oct 15, 2026 by vercel[bot]
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant