Skip to content

Sync upstream pstack through 0.15.36 (c742dd61) #12

Open

Description

@ltx15382710886-png

Request

Please sync this Hermes port from upstream e73df47 to c742dd61 (pstack 0.15.36, 2026-10-27).

main here is still d9454cc (plugin 0.3.1, 2026-10-23), which carries the sync through d457567. Upstream cursor/plugins pstack/plugin.json is already "version": "0.15.36".

Relation to existing PRs

This is not a duplicate of the open sync PRs. I read both bodies.

This report's increment: the three structural commits that landed after e73df47, which neither PR names.

Upstream Date What changed
076f4b2f #791 2026-10-23 /statechart redrawn with the Pele renderer (Obsidian's Mermaid engine) instead of the Mermaid CLI
3c0fdb4e #797 2026-10-23 new /ketchup-video skill
34b1b7c9 #977 2026-10-27 /statechart replaced by a TypeScript compiler: statechart SPEC.tla runs TLC, draws the chart, and reports the shortest path to each broken rule. The chart-to-TLA+ skeleton mode is gone
ab1f702c #986 2026-10-27 0.15.35. /interrogate keeps only findings a run proves (reviewer prompt, rubric, and code-quality review references removed). Arena's judge must be a different model family. Autopilot blocks a PR only for a problem a run or a wrong doc line shows
c742dd61 #1043 2026-10-27 0.15.36. Orchestrate playbook no longer calls the orch CLI. orch.ts and store.ts are deleted. The coordinator uses its own tools (Task, the project tracker, PR/CI subscriptions where the harness has them)

Read from the GitHub API on 2026-10-30. gh api repos/cursor/plugins/contents/pstack/plugin.json returns version 0.15.36.

What I am asking

  1. After sync: upstream pstack d457567..e73df47 #11 merges, sync e73df47..c742dd61 (or rebase sync: upstream pstack d457567..e73df47 #11 so one PR covers through 0.15.36).
  2. Port the /interrogate proof rule and the arena cross-family judge. Both are prose and map onto delegate_task without new runtime.
  3. Decide explicitly what to do with Orchestrate now that upstream deleted the orch scripts. The playbook in this repo (skills/poteto-mode/playbooks/orchestrate.md) still describes the old CLI shape, mapped onto delegate_task and Kanban.
  4. For /statechart and /ketchup-video, either port them or keep the sync: upstream pstack d457567..e73df47 #11 "not ported" note and say it still applies at 0.15.36. The compiler is a Node/Bun/Deno TypeScript program, so a full port is a separate piece of work from the skill-text sync.

I am not asking for the Cursor Task tool or Project tracker to be reimplemented. The Hermes mapping should stay delegate_task.

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions