From 31bcf209076df641ebd662f6d192d3b3a4fdfcaf Mon Sep 17 00:00:00 2001 From: Max Date: Fri, 13 Nov 2026 10:02:53 +0100 Subject: [PATCH] docs(upgrades): move T14 mainnet activation to December 8, 2026 --- src/pages/docs/guide/node/network-upgrades.mdx | 2 +- src/pages/docs/protocol/upgrades/t14.mdx | 4 ++-- 2 files changed, 3 insertions(+), 3 deletions(-) diff --git a/src/pages/docs/guide/node/network-upgrades.mdx b/src/pages/docs/guide/node/network-upgrades.mdx index 88dce33d6..fafc1a78d 100644 --- a/src/pages/docs/guide/node/network-upgrades.mdx +++ b/src/pages/docs/guide/node/network-upgrades.mdx @@ -90,7 +90,7 @@ After an identity rotation, this section and the release table below list the ne | **Details** | [T14 network upgrade](/docs/protocol/upgrades/t14) | | **Release** | Not yet published | | **Testnet** | Scheduled: November 24, 2026 at 15:00 UTC (`1795532400`) | -| **Mainnet** | Scheduled: December 1, 2026 at 15:00 UTC (`1796137200`) | +| **Mainnet** | Scheduled: December 8, 2026 at 15:00 UTC (`1796742000`) | | **Priority** | Required | T14 is scheduled for testnet and mainnet. Node operators must run the T14 release before each network's activation timestamp to stay synced. This section lists the release once it's published. diff --git a/src/pages/docs/protocol/upgrades/t14.mdx b/src/pages/docs/protocol/upgrades/t14.mdx index 2a73f8be5..82ef80e19 100644 --- a/src/pages/docs/protocol/upgrades/t14.mdx +++ b/src/pages/docs/protocol/upgrades/t14.mdx @@ -9,7 +9,7 @@ description: T14 upgrades the Account Keychain so accounts on Tempo support mult T14 upgrades the Account Keychain so accounts on Tempo support multiple signers, with approval thresholds, key rotation, and recovery built into the protocol. It also ends admin access keys' key management and tightens validator, consensus, and Zone Portal rules. :::tip[T14 status] -T14 is scheduled to activate on testnet on November 24, 2026 and on mainnet on December 1, 2026, both at 15:00 UTC. Its scope may still change before activation. Until T14 activates, the account changes run only on the [Tempo Accounts devnet](/docs/accounts/create#connect-to-the-devnet). +T14 is scheduled to activate on testnet on November 24, 2026 and on mainnet on December 8, 2026, both at 15:00 UTC. Its scope may still change before activation. Until T14 activates, the account changes run only on the [Tempo Accounts devnet](/docs/accounts/create#connect-to-the-devnet). ::: **Integration note:** T14 stops new admin access keys and removes existing ones' power to manage other keys. Existing admin keys can still spend without limit until you revoke them. If you use an admin key to manage a user's other keys, plan the change before T14. [See integration impact](#integration-impact). @@ -19,7 +19,7 @@ T14 is scheduled to activate on testnet on November 24, 2026 and on mainnet on D | Network | Status | Activation date (UTC) | Unix timestamp | |---------|--------|-----------------------|----------------| | Testnet | Scheduled | November 24, 2026 15:00 | `1795532400` | -| Mainnet | Scheduled | December 1, 2026 15:00 | `1796137200` | +| Mainnet | Scheduled | December 8, 2026 15:00 | `1796742000` |