Step 1: Project Scaffolding - Task Breakdown #3
Replies: 5 comments
Implementation Log 001: Project Scaffolding and Initial ComponentsDate: 2026-09-13 Step 1: What is complete
Additional implementation already startedThese are partial implementations, not completed blueprint milestones:
The CLI currently reports Git file changes rather than API snapshot differences. Its The web dashboard and automated PR generation remain outstanding. Stabilization included in PR #6
Why: Make the initial components more reliable while avoiding unsafe defaults, broken configuration, and misleading success messages. ValidationThe CI job on PR #6 completed successfully before merge. This confirms the configured CI checks passed, not that the complete drift-detection system is implemented or production-ready. Follow-up
Milestone conclusion: The shared project foundation is in place, and several later components have initial implementations. Step 1 should remain partially complete until local PostgreSQL + Redis setup is delivered. |
Install is the signupDriftLock isn't a normal SaaS with accounts, it's a GitHub App that acts on your repos. So the model mirrors CodeRabbit/Renovate, not Vercel: Two identities, not one:
The resulting loop:
|
Current plan (2026-09-16 to 2026-09-17)App split
Two GitHub identities
Scopes, human sign-in:
Dashboard modelFirst screen is the accounts where DriftLock is installed (own account plus
Account-first, not repo-first. Installs are per-account, and that is what the What humans do in the dashboardPRs always land in GitHub. The dashboard never merges or applies code; it is
Humans act on PRs in GitHub, not in the dashboard. |
|
Abhi tak yeh hua hai: Working features:
What it does end-to-end: Demo proof:
What's NOT done:
Ab kya karna hai — AI agent ya parser? |
Step 1: Final StatusComplete:
Moved to Step 2 (webhook capture):
Still pending (not Step 1 scope):
Conclusion: Step 1 is complete. The foundation is in place and the webhook capture system (which was originally planned for later steps) is already working end-to-end. |
Uh oh!
There was an error while loading. Please reload this page.
Step 1: Project Scaffolding
Status: Ready to Start
Checklist
Monorepo Setup
package.jsonwith workspacesturbo.jsonpipeline config.gitignore(node_modules, dist, .env).env.examplewith all required varsCore Package (
packages/core)src/types/index.ts— All shared interfacessrc/constants/index.ts— Error codes, API endpointssrc/utils/index.ts— Shared helperspackage.jsonwith build scriptsDocker Infrastructure
docker/Dockerfile.sandbox— Bun + test depsdocker/docker-compose.yml— PostgreSQL + RedisVerification
bun installsucceedsbun run buildcompiles all packagesbun run testruns (even if no tests yet)docker compose upstarts all servicesFiles to Create
Questions
Assignee: @NalinDalal
Target: Complete by end of day
All reactions