Upstream sync upstream-sync/2026-09-01 integrates 2daff8c25adf701fddd062ae93b94cc57d420ec2..b883fc066ea5c9bebbe1c3e9b4bc2471aab3685f at merge commit acce690419d10f318b389790f44aa1043a90ea4d (68 commits, 400 files).
The Windows validation is broad, but this batch changes native iOS presentation/composer code, mobile native patches, and native/resource-monitor. Actions are disabled, so the following gates need a suitable host before the sync PR can merge:
Already verified: frozen install and supply-chain policy; 2,363 passing tests on Windows; 16/16 Claude/Grok tests and 14/14 AssetAccess tests on Ubuntu; all changed package typechecks; mobile static check; targeted lint/format; Riker baseline and Lead Agent tests.
Do not mark the sync PR ready or merge until these boxes are resolved.
Upstream sync
upstream-sync/2026-09-01integrates2daff8c25adf701fddd062ae93b94cc57d420ec2..b883fc066ea5c9bebbe1c3e9b4bc2471aab3685fat merge commitacce690419d10f318b389790f44aa1043a90ea4d(68 commits, 400 files).The Windows validation is broad, but this batch changes native iOS presentation/composer code, mobile native patches, and
native/resource-monitor. Actions are disabled, so the following gates need a suitable host before the sync PR can merge:ktlint/detekt)cargo test --locked --manifest-path native/resource-monitor/Cargo.tomlAlready verified: frozen install and supply-chain policy; 2,363 passing tests on Windows; 16/16 Claude/Grok tests and 14/14 AssetAccess tests on Ubuntu; all changed package typechecks; mobile static check; targeted lint/format; Riker baseline and Lead Agent tests.
Do not mark the sync PR ready or merge until these boxes are resolved.