@@ -196,7 +196,7 @@ each packet decided and delivered, as
196196 - [P02b-6 pending aggregate metadata acquisition (2026-10-22)](#p02b-6-pending-aggregate-metadata-acquisition-2026-10-22) — 110 lines
197197 - [P02b-6 hosted browser dependency removal (2026-10-23)](#p02b-6-hosted-browser-dependency-removal-2026-10-23) — 45 lines
198198 - [P02b-6 correction merge and closeout (2026-10-23)](#p02b-6-correction-merge-and-closeout-2026-10-23) — 19 lines
199- - [P02b-7 — BFF session](#p02b-7--bff-session) — 3,133 lines
199+ - [P02b-7 — BFF session](#p02b-7--bff-session) — 3,179 lines
200200 - [P02b-7 decision package (2026-10-23)](#p02b-7-decision-package-2026-10-23) — 213 lines
201201 - [P02b-7 proposal review round 1 (2026-10-23)](#p02b-7-proposal-review-round-1-2026-10-23) — 35 lines
202202 - [P02b-7 proposal review round 2 (2026-10-23)](#p02b-7-proposal-review-round-2-2026-10-23) — 26 lines
@@ -265,6 +265,7 @@ each packet decided and delivered, as
265265 - [P02b-7 observer correction review round 1 (2026-10-24)](#p02b-7-observer-correction-review-round-1-2026-10-24) — 24 lines
266266 - [P02b-7 observer correction review round 2 and source freeze (2026-10-24)](#p02b-7-observer-correction-review-round-2-and-source-freeze-2026-10-24) — 26 lines
267267 - [P02b-7 review correction qualification (2026-10-24)](#p02b-7-review-correction-qualification-2026-10-24) — 83 lines
268+ - [P02b-7 merge and closeout (2026-10-25)](#p02b-7-merge-and-closeout-2026-10-25) — 46 lines
268269- [Status archive](#status-archive) — 112 lines
269270
270271<!-- END GENERATED INDEX -->
@@ -20900,6 +20901,52 @@ that later documentation-only commit. PR #36 remains the maintainer review/merge
2090020901gate; no merge is performed here.
2090120902
2090220903
20904+ ### P02b-7 merge and closeout (2026-10-25)
20905+
20906+ Read-only GitHub verification confirms
20907+ [PR #36](https://github.com/HodeTech/LearnStack/pull/36) merged at
20908+ `2026-10-24T22:16:17Z` (2026-10-25 in Europe/Istanbul), squash commit
20909+ `0dfade02a08fce6bd937fe0554f94f47c571ca8e`. Its source is
20910+ `6b6f0629eac05bd9fe6e63a3185dee1e9ba42c15`. Fetching the merge confirms both
20911+ commits have tree `99098202a0a687cd54d2848f0fcd438bc8862824`; their file contents
20912+ are identical.
20913+
20914+ The [preceding qualification](#p02b-7-review-correction-qualification-2026-10-24)
20915+ owns the implementation source's complete A/1 and B/2 evidence in
20916+ [run 40120289765](https://github.com/HodeTech/LearnStack/actions/runs/40120289765).
20917+ The documentation-only final PR head additionally passes its complete current-head
20918+ assignment in
20919+ [run 40124028474](https://github.com/HodeTech/LearnStack/actions/runs/40124028474):
20920+ 27 successful jobs and all seven required contexts. Retained-evidence verification
20921+ before merge confirms the same manifest, plan, captured toolchains and population:
20922+ 5,931 .NET cases and 2,376 frontend cases, zero skips, all 20 natural producer
20923+ cleanups, nine demo navigations and 27 Lighthouse reports. This merge closeout
20924+ rechecks run metadata and tree equality; it does not rerun tests or claim a new
20925+ post-merge execution.
20926+
20927+ All five implementation steps, their two independent review rounds, and the
20928+ subsequent verified correction bundles are closed. Accepted
20929+ [ADR-0070](../decisions/0070-owned-tenant-bff-sessions.md) and
20930+ [ADR-0071](../decisions/0071-uncertain-account-site-refusals.md) govern the shipped
20931+ native credential owner, host-only opaque cookies, guarded Studio/Portal
20932+ scaffolds, CSRF/Origin admission, refresh/logout and uncertain ordinary AccountSite
20933+ 401 handling. Anonymous public rendering remains independent of sign-in.
20934+
20935+ The actual warm Keycloak/BFF/application-role API proof and the separate
20936+ controlled-grant/API browser cookie/history proof retain their recorded scopes.
20937+ [Phase 06](phase-06-renderer-admin-studio.md) owns full browser-driven OIDC
20938+ journeys and Studio/Portal business functionality;
20939+ [Phase 03](phase-03-identity-admin.md) owns membership/authorization and the
20940+ identity-event ingress; [Phase 11](phase-11-production-hardening.md) owns
20941+ production/distributed session qualification. This merge does not broaden those
20942+ claims or erase earlier failed runs and evidence limits.
20943+
20944+ P02b-7 is complete. The next packet is P02b-8: accept G16's `LS0002` contract
20945+ before its implementation, complete G18's erasure inventory, reconcile remaining
20946+ carriers and verify the catalogue, exact required-check names and phase exit
20947+ criteria. No P02b-8 decision is accepted or implementation started by this
20948+ documentation closeout; Phase 02b remains in progress.
20949+
2090320950## Status archive
2090420951
2090520952The Status block the phase document carried until 2026-10-22, kept verbatim. Its
0 commit comments