Measure entropy/structure metrics as composition parameters vary — the secondary RQ's empirical content.
Priority-if-short-on-time rank: #2 to cut ("separable from having the hybrids exist and work").
Source: plan-checklist.md, "Aug 6-8: Compositional/hybrid generators" and "Priorities if time runs short".
Measure entropy/structure metrics as composition parameters vary — the secondary RQ's empirical content.
Priority-if-short-on-time rank: #2 to cut ("separable from having the hybrids exist and work").
Source: plan-checklist.md, "Aug 6-8: Compositional/hybrid generators" and "Priorities if time runs short".